Mooring Cell Repairs
In the summer of 2012, UCC was contracted to perform turnkey mooring cell repairs for a large fossil fuel plant on the Ohio River. A team of topside and underwater welder fabricators repaired 12 mooring cells that were 16’ in diameter. The repairs ranged from small patch work to installing new [...]