Certified commercial divers

UMPS Assessment & Flow Restoration of Ranney Well Radial Collector Laterals at Connecticut River Power Plant

The Challenge  Cooling water intake cleaning is a continual challenge for power plants. But what happens when the cooling water intakes are screened laterals that are the heart of a Ranney Radial Well System?   The Kleen Energy power plant in Connecticut has two Ranney Vertical Wells supplying their cooling [...]

2022-08-31T22:08:31+00:00August 24th, 2022|

UCC Support of Invasive Mussel Control Demonstration Project

The USGS figure below presents the point distribution map of Dreissena polymorpha throughout the continental US through February 2019. Figure 1: Zebra Mussel Population Estimates Non-native zebra and quagga mussels invaded the Great Lakes region in the early 1990s arriving in foreign ships’ ballast water. Some [...]

2022-08-09T21:39:20+00:00August 8th, 2022|

NASA Underwater Coatings Project

Underwater Coatings for NASA Neutral Buoyancy Laboratory Training Facility UCC successfully executed a surface preparation and underwater coatings application project for NASA’s Neutral Buoyancy Laboratory Training Facility (NBL), covering an expansive area of approximately 26,000 square feet. This involved the treatment of four walls and twelve pits in the [...]

2024-08-27T13:13:25+00:00March 3rd, 2021|
Go to Top