Air Diving Experience

Project Type
Air diving

Project Description

  • Hydroelectric Facility
  •   Work Scope – Head Gate Rail and Cable Tray Service
    •    Drilling and Anchor Installations
    •    Rock and Other Debris Removal
  •   Air Surface Supplied Diving
  •   Depth – 167 Feet
  •   Number of Dives – 250
  •   Unique Variables
    •   Specialized Navy Dive Table and Schedule due to 2400 Feet Altitude
    •   Surface Decompression in a Chamber and In-Water Decompression was Utilized
    •   Nitrox was Utilized During Decompression for Additional Diver Safety

Project Details

Primary Contractor – Turnkey Service Provider
Equipment/Materials
Skills Needed

More Deep Diving Projects

Contact Us