Intake Crib Weld Repair
UCC was contracted to perform inspections on the raw water intake structures at a facility on the Great Lakes. Upon inspection it was found that 75% of the structure cap and support members underneath the cap had clasped over the winter. UCC was further contracted to perform repairs to the [...]